Skip links

Grid Connections

EnergyForce are experts in obtaining new and capacity upgrade grid connections. Our specialist team have over 15 years’ experience in obtaining new import as well as export electricity connections throughout the UK.

Learn More Ask a question

Ensuring the best

The relationships and recognition built with National Grid as well as most Distribution Network Operator’s throughout the UK helps EnergyForce to design, propose and obtain new electricity connections. Our expertise enables EnergyForce to challenge and provide innovation to help our clients obtain the very best solutions whilst ensuring this is achieved with minimal cost.

Get started

Experience in delivery

Our team of Grid Connection experts have experience in delivering thousands of new connections including import connections and generation connections for export. Our expert High Voltage (HV) and Extra High Voltage (EHV) teams have experience in delivering connections up to 50MW as well as connection at Low Voltage LV, 11KV, 33KV, 66KV and 132KV networks.

EnergyForce understands that some of our clients usually expect power to be available, therefore it can come as a shock to understand that costly upgrades may be required to support a new Electric Vehicle charging scheme, a factory expansion or to support a Solar PV installation. This is why we handle the complete design and DNO negotiations looking at all options available to the site to provide the power requirement.

As innovators, EnergyForce can integrate solutions such as Solar PV Panels, Energyforce EnergyGuard or Solar Battery Storage Systems to help sites with their power requirements. Our portfolio of solutions has been developed to assist clients to overcome site-related problems, to facilitate their business growth and to not be held back by crippling electricity infrastructure costs.

LV HV Connections
High Voltage Low Voltage HV LV

End-to-end management

Smart energy control systems are used to help support grid connections as well as obtaining the required permissions from the DNO’s to connect new infrastructure such as electric vehicle charging or electricity generators such as Solar PV. Our control systems work with G100 certification for control of export but also enable site-wide flexibility.

EnergyForce often obtains new import or export grid connections where others have failed.

Our installation teams have a wealth of experience in constructing new networks and associated infrastructure such as substations, transformers, ducting, HV and LV cabling.

EnergyForce have the knowledge and expertise to manage every aspect of your LV and HV requirements from modernisation of existing infrastructure, new electrical installations and future Operations and Maintenance services.

If your business is currently utilising older equipment such as electrical transformers, then modernising this equipment to new eco-options can save considerable electricity, reduce costings and help contribute to lowering your carbon footprint.

If you’d like to explore this option, contact us today and a member of our team will reach out.

Speak to us today

Our team of experts are on hand to guide you with your queries regarding grid connections and any additional solutions that you may be considering for your business.

    You may be interested in…

    Case Studies

    Get in touch

    Start your sustainable energy journey today!

    Get started